‘We Will Fight’: Keystone XL Pipeline Foes Fear Worst for Water Supply

Facing the sunrise on a frigid morning, Rosebud Sioux tribal leader Royal Yellow Hawk offered an ancient prayer in song, his voice periodically muffled by the whistling prairie wind. Behind Yellow Hawk was a cinematic scene from another century: 30-foot-tall tipis arranged in a half circle, quickly brightening in the morning light.

Ogallala Aquifer
Image: Gil Aegerter, NBC News
 This tipi encampment was erected this spring to be a visible and ongoing embodiment of opposition to the proposed Keystone XL Pipeline, which, if constructed, would hug the reservation’s territory in transporting diluted bitumen oil 1,179-miles from Canada’s tar sands to Steele City, Nebraska.

The Keystone XL is being built by the Canadian energy company, Trans Canada. This fourth and final phase of the project—still awaiting approval by the Obama administration—will cost an estimated $5.4 billion. Other segments of the Keystone–at an estimated cost of $5 billion—have been in operation since 2010, bringing the tar sands oil from Hardisty, Alberta, to refineries in the American Midwest and the Gulf Coast.

More from NBC News

Posted by Libergirl

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s